ELECTRICAL SERVICES

EV charger installation.

As specialists in EV charger installations, we help you understand the options and choose a charging solution to suit your budget and preferences. We take care of the process, from planning the installation and handling the required National Grid applications or notifications to installing and commissioning your charger.

Wall-mounted EV charger with a purple indicator and a J L Electrical Services van in the background
Tethered EV charger

THE WORK

Start with your home and vehicle

The right installation depends on more than choosing a charging point. The parking space and existing electrical supply are part of the discussion.

Charger position

Consider where the vehicle parks, how the charging cable will reach it and how the charger fits into daily use.

Supply & cable route

Review the existing electrical supply and the proposed route between it and the charging point.

Charger options & setup

Discuss suitable charger options, controls and the setup you need for everyday charging.

PHOTOGRAPHS

EV charger installation photographs

Examples of our EV charger installations, including charger positions and cable routes.

More of our work

PLANNING THE WORK

From your enquiry to charging

The installation requirements depend on the property and its supply, so these are considered alongside the choice of charger.

  1. Share the essentials

    Send your vehicle details, postcode and photographs to start the conversation.

  2. Review the installation

    Discuss the position, cable route and supply. Identify the network notification or application route and any approval needed before connection.

  3. Install & set up

    Agree the charger and scope, arrange the installation and explain its everyday operation.

START A CONVERSATION

Enquire about EV charging

Share the work you have in mind, the location and your preferred timescale.

Start an enquiry

Helpful information to include

  • Your vehicle or the vehicle you are considering
  • Photographs of the parking space and proposed charger position
  • Photographs of the meter and consumer unit, where readily accessible
  • The property postcode and your preferred installation timing